Creator

Al Panzera

Preview

image preview

Identifier

20148066

Description

An aerial view of the 500-foot reinforced concrete spillway which would discharge flood water at the Grapevine Dam on Denton Creek. (1) Shows the exact spillway section, about two thirds complete, with one area at the spillway crest not yet poured and other pours bottled by curing processes. (2) Points to the top area above the spillway which will be part of the 238,200 acre-feet of water storage for flood control. (3-4) Concrete tie-ins to the dam's earth embankment are shown finished, and (5) points to the spillway channel, bordered by retaining walls near the dam, that will direct the overflow water back into the original creek channel below the dam.

Archival Date

1950-07-04

Collection Name

Fort Worth Star-Telegram Collection

Collection Number

AR406-6-2388

Original Format

Negatives, Black & White

File Format

JPG

Rights

Rights held by The University of Texas at Arlington Libraries, Special Collections. Any use of content downloaded or printed from this page is limited to non-commercial personal or educational use, including fair use as directed by U.S. copyright laws. For more information or for reproduction requests, please contact UTA Special Collections by emailing spcoref@uta.edu.

Subjects

Spillways; Dams; Hydraulic facilities

Subjects

Spillways; Dams; Hydraulic facilities

Share

 
COinS