Graduation Semester and Year

2010

Language

English

Document Type

Thesis

Degree Name

Master of Science in Civil Engineering

Department

Civil Engineering

First Advisor

Mohammad Najafi

Abstract

Reliable cost estimates for construction, and operation and maintenance (O&M) of water treatment plants are essential for their project planning and design. During the planning phases of the project, preliminary cost estimates are developed for major project components, and for screening of alternatives.Construction and O&M cost curves are widely used for developing preliminary cost estimates. This method is time consuming and there is possibility of human errors. Therefore, for this thesis, construction, and O&M cost equations were developed considering historical cost data for different unit operations and processes involved in a water treatment plant. These equations were developed from historical cost data and can be used to develop preliminary cost estimate for different alternative process trains of a water treatment project. The historical cost data were updated to September 2009 costs by using Engineering News Record (ENR) and Bureau of Labor Statistics (BLS) cost indexes, and September 2009 prices of energy and labor.Use of single cost index to further update construction and O&M costs provides a simple and straight forward method for future cost updating using ENR construction and building cost indexes.

Disciplines

Civil and Environmental Engineering | Civil Engineering | Engineering

Comments

Degree granted by The University of Texas at Arlington

4924-2.xltx (50 kB)

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.