ORCID Identifier(s)

0000-0002-0333-6488

Graduation Semester and Year

2022

Language

English

Document Type

Dissertation

Degree Name

Doctor of Philosophy in Civil Engineering

Department

Civil Engineering

First Advisor

Ali Abolmaali

Second Advisor

Hojat Himan Jalali

Third Advisor

Vistasp Karbhari

Fourth Advisor

Shih-Ho Chao

Abstract

Prestressed I-girders are one of the very commonly and widely used girders for bridges. It is produced at precast plant and transported to bridge site. To produce a prestressed I-girder, strands are first pulled and concrete is poured in I-girder’s formwork. Once the concrete reaches a desired strength, strands are released which induce prestress in I-girder. There are mainly two types of design for I-girders-one that requires debonding of strands at the end of I-girders and another that requires harping of strands at the end of I-girders. The debonding and harping of strands are done to reduce tension at the top flange of I-girder as required strength for moment at the end of I-girders are much less than at mid-span of I-girders. The requirement of de-bonding criteria limits its utilization for all design cases as different bridges have different span length and girder depth requirements. This study focuses on I-girder with harped strand case as it is very commonly used and cracks at the girder ends are commonly observed. Reinforcement bars are used at the ends of I-girders to limit the width of the cracks. However, sometimes the cracks are wider and can result in rejection of the I-girder by quality control personnel. When wider cracks are observed, spacing of vertical reinforcements are reduced to reduce crack width, but the spacing can be reduced only to certain extent due to congestion of the reinforcement. Therefore, the cracks width cannot be minimized to desired level in all cases by reducing the spacing of vertical bars. Moreover, a corrective action is required if wider cracks are observed on a repetitive basis that exceeds the limit provided on fabrication notes. The wider cracks can allow moisture to reach the reinforcements and strands easily resulting in corrosion, which can reduce the durability of I-girders. Previous studies have shown that increasing area of reinforcement bars will not further help in significantly minimizing the crack width. In this study, a non-linear finite element modeling (FEM) approach was used to show that using a prestressing strand in I-girder web in vertical direction at the girder ends can significantly minimize the cracks. The FEM modeling assumptions were validated by comparing with experimental data available in the literature. In addition, sensitivity analysis was performed and non-linear regression equation was developed.

Keywords

I-Girder Ends, Cracks, Prestress, FEM

Disciplines

Civil and Environmental Engineering | Civil Engineering | Engineering

Comments

Degree granted by The University of Texas at Arlington

Share

COinS