ORCID Identifier(s)

0000-0001-7922-2746

Graduation Semester and Year

2019

Language

English

Document Type

Dissertation

Degree Name

Doctor of Philosophy in Civil Engineering

Department

Civil Engineering

First Advisor

Mohammad Najafi

Abstract

The development of underground infrastructure, environmental concerns, and economic trends is influencing society, resulting in the advancement of technology for more efficient, environment-friendly, and cost-effective pipeline installation and renewal. Comparison of environmental and social costs of a pipeline renewal and replacement is an essential element when considering sustainable development of underground infrastructure. Project owners, decision makers, design and consulting and contractors commonly take into consideration the construction costs only, and overlook the environmental and social cost aspects while making a choice between trenchless and open-cut pipeline installation. Trenchless Cured-in-Place Pipe (CIPP) involves a liquid thermoset resin saturated material that is inserted into the existing pipeline by hydrostatic or air inversion, or by mechanically pulling-in and inflating. The liner material is cured-in-place using hot water, steam or light cured using UV light resulting in the CIPP product. The primary objective of this dissertation is to compare environmental and social costs of trenchless CIPP renewal method with open-cut pipeline replacement for small diameter sanitary sewers and to identify influencing factors Impacting costs An actual case study based on the City of Pasadena, California, river basin was used for this research to evaluate the environmental and social costs implication of small diameter CIPP renewal and open-cut replacement. The results of this dissertation, for the case study used, show that the total environmental and social costs of trenchless CIPP method is 90% less as compared to open-cut pipeline replacement for small diameter sanitary sewers, such as 8 in. to 12 in. diameters. For this case study, it was determined that the environmental impacts of CIPP will be more than its social impacts. For open-cut, the social impacts are found to be more than environmental impacts. The methodology used in this dissertations can be applied for larger pipe diameters and other locations to develop a decision tool. CIPP renewal caused less ozone depletion, global warming, smog, acidification, eutrophication, non carcinogenics, respiratory effects, ecotoxicity effects, and fossil fuel depletion. The liner, felt, and resin influenced environmental cost the most for CIPP compared to open-cut where power consumption of construction equipment, and pipe material drove the environmental cost. Cost of fuel for detour roads, detour delay, and pavement restoration were negligible for CIPP renewal method as compared with open-cut replacement that contributed a major social cost factor (approximately 75%).

Keywords

Environmental cost, Social cost, Trenchless technology, Cured-in-Place Pipe (CIPP), Open-cut pipeline replacement, Sustainability, SimaPro, Life cycle assessment, Sanitary sewers

Disciplines

Civil and Environmental Engineering | Civil Engineering | Engineering

Comments

Degree granted by The University of Texas at Arlington

28669-2.zip (7141 kB)

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.